BRHSLIST
[Top] [All Lists]

Re: [CBQ] For those interested - Current Status of the U25C Project as o

To: <CBQ@yahoogroups.com>
Subject: Re: [CBQ] For those interested - Current Status of the U25C Project as of 07/05/2006
From: "Charlie Vlk" <cvlk@comcast.net>
Date: Fri, 7 Jul 2006 12:33:04 -0500
Comment: DomainKeys? See http://antispam.yahoo.com/domainkeys
Delivered-to: archives@nauer.org
Delivered-to: mailing list CBQ@yahoogroups.com
Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=lima; d=yahoogroups.com; b=ElIX4ffj/jRVK0Nyo2LYOxzP58iUlhQw7wzgfcBp1vvdEEO4QYA23aJ/Z6U+0cNl1ZnAtJjWcA9HfNolEjhTskokkE7VmrPdP0A9FUpXY0BuLz6b/w7oJkFzQgDS6btr;
List-id: <CBQ.yahoogroups.com>
List-unsubscribe: <mailto:CBQ-unsubscribe@yahoogroups.com>
Mailing-list: list CBQ@yahoogroups.com; contact CBQ-owner@yahoogroups.com
References: <02b101c6a0ba$21a042b0$0301a8c0@STAMPEDEDEV>
Reply-to: CBQ@yahoogroups.com
Sender: CBQ@yahoogroups.com
Unless you can't Live Another Day without a U25C, I wouldn't put a lot of 
effort into such a project.
Or, if you like, go ahead with the agony of building one and claim that it was 
your completing the
model that triggered the commercial release of the U25C.....
Charlie Vlk
Railroad Model Resources


  ----- Original Message ----- 
  From: Robert Giffin 
  To: CBQ@yahoogroups.com 
  Sent: Thursday, July 06, 2006 12:07 AM
  Subject: [CBQ] For those interested - Current Status of the U25C Project as 
of 07/05/2006


  Current Status of the U25C Project
  (http://groups.yahoo.com/group/u25cproject/) as of 07/05/2006:
  ----------------------------------------------------------
  There are currently 254 active members. We've had to moderate membership
  requests and first posts to protect ourselves from the SPAMimals. Please
  don't let that discourage you from joining us. We can use the support in
  numbers to strengthen our case with industry.
  ----------------------------------------------------------
  a) We are still pursuing the NWSL repowering option as well as any other
  options for producing an inexpensive repowering solution. Current status on
  the NWSL option is that we are set, hopefully, to meet with them the week of
  24 July in Seattle. They are so far receptive to the meeting. We have gear
  tower drawings from both Brian Banna and Brian Everett to show them.
  ----------------------------------------------------------
  b) Somewhat closer to reality, Kaslo Shops ( <http://www.kasloshops.com/>
  http://www.kasloshops.com) is proposing a repowering kit for the Rivarossi
  U25C, aftermarket details, and a complete U25C model. It is basically the
  Jeff Briggs kit, introduced over a year ago but never produced. John
  Whitmore from Kaslo has purchased the project from Jeff Briggs and is
  planning, depending on the interest garnered from this group, to produce the
  following, in order:

  1) A Rivarossi U25C repower kit, retailing for $125.00 USD (some photos in
  the Photos section), including :

  A water-cut steel frame; A state-of-the-art can motor; Dual flywheels;
  Drive train; Resin gear towers; Resin truck sideframes; NWSL wheelsets;
  Resin fuel tank; McHenry couplers; Window glazing; Sound ready; DCC ready

  2) An aftermarket detail kit, retailing for $60.00 USD (some photos in the
  Photos section), including:

  a) The following .006" Stainless Steel etched parts: 6 windshield
  wipers; 2 cab side window frames; 1 winterization window; 1 winterization
  window base; 4 number boards; 12 GE lift rings; 1 rearview mirrors; 1
  Sinclair antenna; 4 wind deflectors; 2 headlight plates; 2 sunshades with
  tracks; 5 cab door handles; 1 exhaust stack screen; 1 top radiator walkway;
  1 top radiator walkway base; 2 side intake screens; 1 top radiator fan
  assembly; 2 dynamic brake grid assemblies

  b) The following .009" phosphor-bronze etched parts: 2 side sill filler
  pieces; 2 end handrail center stanchion assemblies; 27 standard handrail
  stanchions; 2 drop steps; 1 brake wheel; 4 footboards; 10 cut lever
  brackets; 1 rear radiator ladder

  c) The following cast resin parts: 1 radiator core assembly; 2 pilot
  filler assemblies; 1 cab interior

  3) A walkway replacement in GE 'equidot' pattern (photo in the Photos
  section), retailing for approximately $20.00 USD, expressly for this group
  to upgrade the walkways on the Rivarossi U25C to 'near prototype'.

  *** The three items above could be available as soon as September 2006,
  depending on commitments from the group.

  4) A complete, phase detail specific, sound and DCC capable (based on the
  repower frame) HO scale U25C, expected to retail for around $300.00 USD.

  *** This item would be available NLT second quarter 2007. Would be funded
  with purchases of the repower kit and detail sets.
  ----------------------------------------------------------
  Will keep you all posted as we center on our solutions.

  Robert Giffin - Group Moderator

  [Non-text portions of this message have been removed]



   

[Non-text portions of this message have been removed]



------------------------ Yahoo! Groups Sponsor --------------------~--> 
Great things are happening at Yahoo! Groups.  See the new email design.
http://us.click.yahoo.com/TISQkA/hOaOAA/yQLSAA/8ZCslB/TM
--------------------------------------------------------------------~-> 

 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/CBQ/

<*> To unsubscribe from this group, send an email to:
    CBQ-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/
 




<Prev in Thread] Current Thread [Next in Thread>