BRHSLIST
[Top] [All Lists]

Re: [CBQ] Re: Videos

To: CBQ@yahoogroups.com
Subject: Re: [CBQ] Re: Videos
From: "Jim's Junction trains28@bresnan.net [CBQ]" <CBQ@yahoogroups.com>
Date: Fri, 25 Sep 2015 10:38:35 -0600
Authentication-results: mta1004.groups.mail.bf1.yahoo.com from=bresnan.net; domainkeys=neutral (no sig); from=bresnan.net; dkim=neutral (no sig)
Delivered-to: archives@nauer.org
Delivered-to: mailing list CBQ@yahoogroups.com
Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=echoe; t=1443199116; bh=5F14bq2dwngKqRX0sTGRLZxzgoxyMwoc+FrWs/a5qf0=; h=In-Reply-To:References:To:From:List-Id:List-Unsubscribe:Date:Subject:Reply-To:From:Subject; b=f6XBKCShH52dpebUY09UO9lulv2l6W0ic3GIDufTZDz8YGApJlWid4GLZUObCJrv7S4jceNtOO0+/B/TqItVzQMI5jnvl3PMQc/zv7FL0N96zS5w6hVSqj4v4IF0HZpvBp3OLwYFm+8dvIvwu+O3C84QUj6qSRD/Ahgv7C5IgLI=
In-reply-to: <mu3s3k+1krc74j@YahooGroups.com>
List-id: <CBQ.yahoogroups.com>
List-unsubscribe: <mailto:CBQ-unsubscribe@yahoogroups.com>
Mailing-list: list CBQ@yahoogroups.com; contact CBQ-owner@yahoogroups.com
References: <157FDFE6-2C2E-4AA2-9089-3FF188555415@gmail.com> <14fffd762dd-10fc-c4c@webprd-m41.mail.aol.com> <mu3s3k+1krc74j@YahooGroups.com>
Reply-to: CBQ@yahoogroups.com
Sender: CBQ@yahoogroups.com


There were 6 complete CZ trainsets originally- with extra cars ordered at a later date. This allowed daily eastbound and westbound service between Oakland and Chicago. The CB&Q ordered 3 A-B-A sets of F-3's (9960 ABC, 9961 ABC & 9962 ABC) for CZ service. The CB&Q owned 3 sets of CZ equipment, Western Pacific 2 sets and the D&RGW 1 set.

   John Olson
   Billings, Mt


On Sep 25, 2015, at 10:18 AM, drsager2@yahoo.com [CBQ] wrote:



I may be late to the party, but since I just re-watched the video last night I thought I'd bring this up...

During the D&RGW section of the film they point out a meet of an eastbound and westbound CZ, so we know at least the D&RGW had multiple trainsets.  Seeing as how the CB&Q portion of the route was more than a 12-hour trip, would it not be probable that there were actually 2 (or more) consists?  Since there was only 1 F3 ABA set, there had to be something else pulling the trains.  Even if they changed power somewhere along the route so that the F3 lash-up could stay on the western side, there still had to be other locos pulling the CZ.

According to the 1950 CZ timetable, departure from Chicago was at 3:30pm. The train arrived in Denver at 8:20am the following morning, all being handled by the CB&Q. The eastbound left Denver at 7:15pm and arrived in Chicago at 1:30pm the next day (again, all Burlington).  It would be impossible for the same units arriving in Denver at 8 in the morning to make it back to Chicago for that day's afternoon departure.  With a daily schedule, the CB&Q must have had at least one more consist to handle the "every other day" turnaround in the timetable. 

Am I missing something?





__._,_.___

Posted by: Jim's Junction <trains28@bresnan.net>



__,_._,___
<Prev in Thread] Current Thread [Next in Thread>