Bill: Regarding the line into Leavenworth, I found signal information indicating that US&S electric train staff (a form of controlled manual block) was installed between Stillings Jct. and Leavenwort
Glen, Employee Timetable 50 St Joseph Division effective January 9, 1938 for the Leavenworth and East Leavenworth Sub-division: "Yard limits extend East Leavenworth to Stillings Jct Staff system betw
Glen, Some additional info. I talked to my CGW friend. He gave me some contacts with the timetables and I plan to get in contact with them to see if I can get a date. My CGW friend said Stillings Jun
Glen, I have found more about the staff system. I found a reference to a Rock Island operating manual. It states the electric train staff system was in effect on the Leavenworth Terminal railroad bet
Bill: Thanks for all of the information on the staff system. Glen Haug Glen, I have found more about the staff system. I found a reference to a Rock Island operating manual. It states the electric tr