Search String: Display: Description: Sort:

Results:

References: [ +from:bkewinger@yahoo.com: 164 ]

Total 164 documents matching your query.

61. Re: [CBQ] Re: Question regaring CB&Q 5-chime steptop locomotive whistles (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Wed, 10 Feb 2010 19:16:12 -0800 (PST)
back when 1522 made the trip across iowa going from linclon to galesburg they had a burlington whistle on it and sound real good but i don't know where it had come from bill ewinger burlingtonn iowa
/archives/BRHSLIST/2010-02/msg00084.html (12,449 bytes)

62. [CBQ] Burlington Bridge (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sat, 09 Jan 2010 08:30:20 -0600
Morning all if you are interested in how the bridge cond=struction coming check the Hawkeye newspaper after 11:00am central time today for the complete article.they had been drilling on the south sid
/archives/BRHSLIST/2010-01/msg00076.html (9,838 bytes)

63. [CBQ] burlinton bridge (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sun, 04 Dec 2011 13:55:02 -0600
just post three more photos kind of articst one of the cutting torch trails bill ewinger burlington Iowa -- Yahoo! Groups Links <*> To visit your group on the web, go to: http://groups.yahoo.com/grou
/archives/BRHSLIST/2011-12/msg00018.html (9,485 bytes)

64. [CBQ] tempory bridge section (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sun, 04 Dec 2011 13:55:02 -0600
they installed a tempeory open deck bridge section ys=esterday between the old shore prier and new shore prier.looks to be around 200' long and the excavated the soil from underneath the span. that w
/archives/BRHSLIST/2011-12/msg00019.html (10,023 bytes)

65. [CBQ] caboose questions (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Thu, 15 Dec 2011 18:55:01 -0600
can someone explain the reason for the beds and cooking stove in the caboose pictures that hol just posted. did the crew live in the caboose all time and not have any home life? and if the prepared m
/archives/BRHSLIST/2011-12/msg00163.html (10,531 bytes)

66. Re: Fwd: [CBQ] caboose questions (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Thu, 15 Dec 2011 18:02:41 -0800 (PST)
so this would apply to all the railroad in the country at that time frame bill ewinger From: "qutlx1@aol.com" <qutlx1@aol.com> To: cbq@yahoogroups.com Sent: Thursday, December 15, 2011 4:34 PM Subjec
/archives/BRHSLIST/2011-12/msg00169.html (14,888 bytes)

67. Re: [CBQ] Re: Surviving CB&Q cabooses (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Thu, 29 Dec 2011 06:49:32 -0800 (PST)
that caboose came from the tourist railroad down at farmington iowa bill ewinger burlington iowa From: Mr Larry L. Doub <larry_l_doub@yahoo.com> To: CBQ@yahoogroups.com Sent: Thursday, December 29, 2
/archives/BRHSLIST/2011-12/msg00330.html (14,399 bytes)

68. [CBQ] burlington bridge fixed spans (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sun, 06 Nov 2011 12:55:01 -0600
just added a picture to the above file of one of the spans that was removed on 10-22-11. the span has been moved to the Iowa shore so it can be cut up for scrap Bill Ewinger burlington Iowa -- Yahoo!
/archives/BRHSLIST/2011-11/msg00043.html (10,159 bytes)

69. [CBQ] new pictures (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Sun, 13 Nov 2011 11:28:53 -0800 (PST)
just posted 6 more photos of the cutting up the first fixed span   bill ewinger burlington iowa [Non-text portions of this message have been removed] -- Yahoo! Groups Links <*> To visit your group on
/archives/BRHSLIST/2011-11/msg00136.html (9,749 bytes)

70. [CBQ] burlington bridge fixed spans (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sun, 20 Nov 2011 13:55:01 -0600
just post three more shots of the work here on the bridge.jpg-2 shows the difference between the old span and new sapn for size.jgp 3 shows the next span has been moved to the shore for cut up. bill
/archives/BRHSLIST/2011-11/msg00160.html (10,244 bytes)

71. Re: [CBQ] burlington bridge fixed spans (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Sun, 20 Nov 2011 12:49:22 -0800 (PST)
there is four more to go east of the new lift span and two west of the lift span   next two going in will be dec. 10 and 11 and then walsh is shutting down for the winter as they have no room to buil
/archives/BRHSLIST/2011-11/msg00162.html (11,935 bytes)

72. [CBQ] signals at Burlington (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Wed, 23 Nov 2011 10:47:35 -0800 (PST)
The south street signal bridge is in the process of being replaced by a new one.If anybody can help i need some help understanding the signal bridge that is going in.the new bridge will have three ro
/archives/BRHSLIST/2011-11/msg00175.html (10,411 bytes)

73. [CBQ] new pictures (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Thu, 24 Nov 2011 14:40:08 -0800 (PST)
just added five new pictures to the fixed span file of the burlington railraod bridge   jgp 5 11-24-11   show the cutting on the second span from the replacement in october   jgp 6 11-24-11   another
/archives/BRHSLIST/2011-11/msg00182.html (10,516 bytes)

74. Re: [CBQ] signals at Burlington (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Thu, 24 Nov 2011 15:15:29 -0800 (PST)
Glen   i have somemore pictures to show were the other signal bridge is going and it is also a three light cantilever Bill: The old cantilever (two track cantilever at MP 204.99) only had signals for
/archives/BRHSLIST/2011-11/msg00184.html (12,239 bytes)

75. [CBQ] signal bridge pictures (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Thu, 24 Nov 2011 15:33:42 -0800 (PST)
jgp 1 11-24-11   this is the new signal bridge for east bound trains at the west end of south street corssovers as uou can see three lights on the cantilver   jgp 2 11-24-11   show the base for the n
/archives/BRHSLIST/2011-11/msg00186.html (10,555 bytes)

76. Re: [CBQ] signal bridge pictures (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Sat, 26 Nov 2011 10:04:55 -0800 (PST)
thanks glen for the explanation . bill From: GLEN HAUG <glenehaug@msn.com> To: cbq@yahoogroups.com Sent: Friday, November 25, 2011 8:50 PM Subject: RE: [CBQ] signal bridge pictures It looks to me lik
/archives/BRHSLIST/2011-11/msg00203.html (15,373 bytes)

77. [CBQ] burlington bridge fixed spans (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sun, 23 Oct 2011 18:55:02 -0600
started yesterday morning about 8:30am to watch them put the two new fixed span in on the east side of the river.by the time i got there they already had both old span out and the middle new span in
/archives/BRHSLIST/2011-10/msg00167.html (10,594 bytes)

78. Re: [CBQ] Burlington bridge (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Sun, 25 Sep 2011 07:19:46 -0700 (PDT)
no the new span is still sitting right where the built it. There are now three section built on the river bank east of wever iowa in green bay bottoms.we need six section east of the lift span and on
/archives/BRHSLIST/2011-09/msg00145.html (10,823 bytes)

79. [CBQ] burlington bridge (score: 1)
Author: "Bill" <bkewinger@yahoo.com>
Date: Sun, 25 Sep 2011 18:55:01 -0600
just post three pictures from green bay bottoms where wlash has built three of the fixed span. 93-94-95 are the numbers of these pictures bill ewinger burlington iowa -- Yahoo! Groups Links <*> To vi
/archives/BRHSLIST/2011-09/msg00157.html (9,741 bytes)

80. Re: [CBQ] Bulletin (score: 1)
Author: Bill Ewinger <bkewinger@yahoo.com>
Date: Thu, 11 Aug 2011 17:32:29 -0700 (PDT)
i have mine in burlington iowa   bill ewinger   Bulletin still has not made it to E. central Iowa, Dick Schultz SD Bulletin came on Tuesday 8/9 here in the foot hills of SC Steve The Bulletin arrived
/archives/BRHSLIST/2011-08/msg00097.html (12,367 bytes)


This search system is powered by Namazu