BRHSLIST
[Top] [All Lists]

RE: [CBQ] Re: E5 details

To: <CBQ@yahoogroups.com>
Subject: RE: [CBQ] Re: E5 details
From: "Charlie Vlk" <cvlk@comcast.net>
Date: Fri, 31 Aug 2012 18:11:24 -0500
Delivered-to: unknown
Delivered-to: archives@nauer.org
Delivered-to: mailing list CBQ@yahoogroups.com
Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=lima; t=1346454692; bh=QD/mdmiyMlMnf0Dn3WyWEDeyAuGkRRvwjLLyHIPHQsA=; h=Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:X-Received:To:References:In-Reply-To:Message-ID:X-Mailer:Thread-Index:Content-Language:X-Originating-IP:X-eGroups-Msg-Info:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type; b=gjhJr9m/sPl9epCKl9OEZ7zhRThjwBe27ysb+/szfRa9eKlRn4/5qWCdQ0gaIU7xBvP453q41T0h7TYiNLxRhGlLsz+ofqIKZ9AucqGkhu0tmcXtNq5uEg2Z9TxoF8J1
Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=lima; d=yahoogroups.com; b=R18afjLBCtiGSXEYw529lKqRNkb4AYYgYznWEepaAi9cmBjWOmpeYX1YHnvlHSKrOmoG/kn0pUOPcxp4JN6g31l75/vnvg/4iPX4TmY0JYQl+xth8Cj8lvy4i65BYG5f;
In-reply-to: <78A1B762-1184-44AD-A108-C116EC328F11@bresnan.net>
List-id: <CBQ.yahoogroups.com>
List-unsubscribe: <mailto:CBQ-unsubscribe@yahoogroups.com>
Mailing-list: list CBQ@yahoogroups.com; contact CBQ-owner@yahoogroups.com
References: <k1rapa+qmaq@eGroups.com> <78A1B762-1184-44AD-A108-C116EC328F11@bresnan.net>
Reply-to: CBQ@yahoogroups.com
Sender: CBQ@yahoogroups.com
Thread-index: Ac2HwwN14nyp0VIZSN6k6K+5WJBV+gAAWxpg


Keith-

The Phase refers to the as-built configuration of a unit.   E-5s were built in early and late 1940 and mid 1941.   Most E-6s were built after 1941.

So the only Phase II units are E5A 9914A,B – 9915A,B/.  These four units were originally intended to be run as A-A combination locomotives.   The earlier Phase I units were purchased as an individual units 9909 & 9913, and A/B locomotives 9910A,B – 9912 A,B, 9950A,B and 9980A,B.

There were some differences between the Phase I and Phase II units on the side of the cab and on the ends of the units.

The Valerio units are based on the LifeLike E6 shell so most closely resemble the Phase II E5A shell.  The B units had different roof radiators and nobody has gotten them correct AFAIK in brass or whatever.

Bare Metal Foil is going to be a task to get over all the corrugations and other surface detail but might turn out to be very striking.

You are doing a lot of work considering Kato is bringing out the units RTR…..I’d at least do them as Phase II Units.   There is a strong possibility that Kato might do the E5B later to pull a 1948 Twin Cities Zephyr if the sales of the Silver Streak Zephyr and separate E5s are good….so all of us need to buy out their production, even though Mr. Wallet and Mrs. Credit Card may not be happy!!!

Charlie Vlk

 

EA-5                               

EB-5

967-970 02-03/40             

971-973 02-03/40

9910A  

Silver Speed 

 /

9910B

Silver Power

9911A 

 Silver Pilot    

 / 

9911B

Silver Mate

9912A  

Silver Meteor

 / 

9912B

Silver Comet

9909

Silver Bullet

1035 03/40

1037 03/40

C&S 9950A

Silver Racer

 / 

9950B

Silver Steed

1036 03/40

1038 03/40

FW&D 9980A

Silver Chief

/

9980B

Silver Warrior

1033 10/40

9913

Silver Wings

1301-1304  6/41

9914A

Silver Arrow

/

9914B

Silver Swift

9915A

Silver Carrier

/

9915B

Silver Clipper

 



__._,_.___


Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___
<Prev in Thread] Current Thread [Next in Thread>