hi;i would bet they will place two barges under it and jack it up and float
it out, demo the center swing pier,drill the charge holes before floating the
swing span,after swing span is floated away,set charges and blast,and float in
new lift span,ready to go in 12 to 16 hours, ken chapin
--- On Sat, 4/25/09, Michael Matalis <mmatalis@sprynet.com> wrote:
From: Michael Matalis <mmatalis@sprynet.com>
Subject: Re: [CBQ] Burlington Railroad Bridge
To: CBQ@yahoogroups.com
Date: Saturday, April 25, 2009, 7:44 PM
When the P&PU bascule bridge in Peoria was replaced in the early 80's
they basically built the new bridge around the old except for the lift
span, which was built on land. On the day of reckoning the old lift
span was demolished using explosives, and then the new lift span was
barged into place and connected between the two new towers. The
bridge was out of service for less than ten hours. I have to assume
about the same thing will happen this time around, the only trick
being what will they do with the center swing pier.
Thank you kindly,
Michael Matalis
mmatalis@sprynet. com
See my photos and my ugly mug at: http://www.flickr. com/photos/ prairierailfan/
On Apr 25, 2009, at 6:30 PM, Stephen Levine wrote:
> Is the bridge going to be passable during construction?
>
> Or how will they route trains over the Mississippi River?
>
[Non-text portions of this message have been removed]
------------------------------------
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/CBQ/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/CBQ/join
(Yahoo! ID required)
<*> To change settings via email:
mailto:CBQ-digest@yahoogroups.com
mailto:CBQ-fullfeatured@yahoogroups.com
<*> To unsubscribe from this group, send an email to:
CBQ-unsubscribe@yahoogroups.com
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/
|