- 1. [CBQ] Hannibal Trains Orders (score: 1)
- Author: "wdhirt" <whirt@sbcglobal.net>
- Date: Thu, 15 Mar 2012 21:55:02 -0600
- I just posted a file with train orders and forms for Hannibal in June 1967. Take a look at the Track Operators line ups in the file. The June 30 line up is typical for the Brookfield sub. However, th
- /archives/BRHSLIST/2012-03/msg00234.html (10,344 bytes)
- 2. Re: [CBQ] Hannibal Trains Orders (score: 1)
- Author: STEVEN HOLDING <sholding@sbcglobal.net>
- Date: Thu, 15 Mar 2012 20:13:22 -0700 (PDT)
- I just posted a file with train orders and forms for Hannibal in June 1967. Take a look at the Track Operators line ups in the file. The June 30 line up is typical for the Brookfield sub. However, t
- /archives/BRHSLIST/2012-03/msg00235.html (12,975 bytes)
- 3. Re: [CBQ] Hannibal Trains Orders (score: 1)
- Author: Bill Hirt <whirt@sbcglobal.net>
- Date: Thu, 15 Mar 2012 22:39:57 -0500
- Steve, Here was the line up: Trains expected between North River and Brookfield between 620 am and 1201 pm June 22 1967 No 55 Eng 9977 left Macon 603 am No 7 Eng 9942A Extra 9942A West Left Ely 557 a
- /archives/BRHSLIST/2012-03/msg00236.html (14,084 bytes)
- 4. RE: [CBQ] Hannibal Trains Orders (score: 1)
- Author: GLEN HAUG <glenehaug@msn.com>
- Date: Thu, 15 Mar 2012 23:29:37 -0700
- After reading this lineup, I have a fundamental operating question. Why was there a lineup at all for any location from Macon east? This was CTC territory. Was it CB&Q practice to issue a lineup in C
- /archives/BRHSLIST/2012-03/msg00237.html (13,968 bytes)
- 5. Re: [CBQ] Hannibal Trains Orders (score: 1)
- Author: STEVEN HOLDING <sholding@sbcglobal.net>
- Date: Fri, 16 Mar 2012 04:59:54 -0700 (PDT)
- Steve, Here was the line up: Trains expected between North River and Brookfield between 620 am and 1201 pm June 22 1967 No 55 Eng 9977 left Macon 603 am No 7 Eng 9942A Extra 9942A West Left Ely 557
- /archives/BRHSLIST/2012-03/msg00238.html (14,932 bytes)
- 6. Re: [CBQ] Hannibal Trains Orders (score: 1)
- Author: Bill Hirt <whirt@sbcglobal.net>
- Date: Fri, 16 Mar 2012 08:58:11 -0500
- Glen, That is interesting because there is another line up from June 30 for the same section of track: Trains expected between North River and Brookfield between 605 am and 1201 pm No 55 out of Macon
- /archives/BRHSLIST/2012-03/msg00240.html (14,657 bytes)
This search system is powered by
Namazu