Not aware of track plans available but take it from somebody w/a little
experience switching earth moving equipment plants here's a snap shot of what
you'll need: A track for coal delivery for the power plant, a trk or 2 for
scrap loading in gons,a trk or 2 for unloading steel plate from gons and
flats, a trk for unloading "blocking timbers" from flats, a trk or 2 to
stage the mty flats for implement/tractor loading, a trk or two to set loads
of the above over for holding for measuring, and finally a trk or 2 or 3 that
run inside a building and have loading docks/platforms flush w/the car decks
for driving the equipment onto the cars. Leo
p.s. This is a generic basic requirement learned from switching Cat,Barber
Greene,Austin Western on the old Aurora Div.