BRHSLIST
[Top] [All Lists]

Mixed Train Operations

To: BRHSlist@egroups.com
Subject: Mixed Train Operations
From: kammfive@a...
Date: Sun, 9 Apr 2000 22:23:47 EDT
The number of mixed train photos in the 2000 calendar and my own interest in 
these trains brings up a question. How were passengers handled if there was 
any switching to be done in a town? I assume that the coach or rider car 
would be left at the depot if at all possible. If the coach could not be 
left, would passengers detrain during switching operations? I assume that 
any of the various "drop" maneuvers recently discussed on the list would be 
out of the question, at least with the coach in the train.

I recently attended an open house at the Fox Valley O Scalers. A mixed train 
(Milwaukee Road prototype) was in operation at one point. The passenger 
accommodations (a coach) was coupled immediately behind the engine, and the 
train concluded with a normal caboose. Ted Schnepf pointed out to me that 
the Milwaukee liked to do that so that paying passengers were not subjected 
to all the slack action of a lengthy freight train.

Al Kamm
kammfive@a...

<Prev in Thread] Current Thread [Next in Thread>