- 1. [CBQ] West Burlington Shop (score: 1)
- Author: "bllburge" <bllburge@yahoo.com>
- Date: Tue, 07 Apr 2009 11:24:25 -0600
- How many locomotives could be placed inside the shop? Were there any other buildings that locomotives could be placed for repair or rebuild work? Thanks. Have a good one. Bill Burge Marion,Iowa -- Ya
- /archives/BRHSLIST/2009-04/msg00062.html (10,646 bytes)
- 2. Re: [CBQ] West Burlington Shop (score: 1)
- Author: "Russ Strodtz" <normansen@groundcontrol.us>
- Date: Tue, 7 Apr 2009 12:19:05 -0500
- Bill, Number placed inside the shop? Question is not answered. Place into other buildings? No. Main tracks in building? Three. Machine and Erecting Shop (Bldg. #7) Specifications: 1. Built in 1916, S
- /archives/BRHSLIST/2009-04/msg00063.html (11,018 bytes)
- 3. RE: [CBQ] West Burlington Shop (score: 1)
- Author: "Dave Lotz" <Dave_Lotz@bellsouth.net>
- Date: Tue, 7 Apr 2009 13:56:56 -0400
- Hi Bill, The answer to your question depends upon what dates you're looking for. The shops have been in existance since 1886. The shops up to the later days of the CB&Q had several buildings, but aft
- /archives/BRHSLIST/2009-04/msg00064.html (11,284 bytes)
This search system is powered by
Namazu