Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[CBQ\]\s+Re\:\s+Zearing\s+to\s+Walnut\s+IL\s*$/: 1 ]

Total 1 documents matching your query.

1. [CBQ] Re: Zearing to Walnut IL (score: 1)
Author: "zephyr98072" <glenehaug@msn.com>
Date: Fri, 12 Oct 2007 23:21:08 -0600
Mike: I believe Zearing to Walnut was abandoned in 3 different stages. The original IV&N ended just east of the depot at Walnut, constructed in 1888. The depot was at MP 59.98 and the switch was at M
/archives/BRHSLIST/2007-10/msg00091.html (11,419 bytes)


This search system is powered by Namazu