- 1. [CBQ] Mt. Morris Track Plan - Piggyback Operations (score: 1)
- Author: "thommack" <thommack@yahoo.com>
- Date: Mon, 20 Dec 2010 06:45:03 -0600
- Jerry, Thanks for the great answers. One point of clarification: In an earlier post you said that Tracks 3 and 4 were inside tracks but were also the tracks used for the piggybacks. In your last e-ma
- /archives/BRHSLIST/2010-12/msg00249.html (13,739 bytes)
- 2. Re: [CBQ] Mt. Morris Track Plan - Piggyback Operations (score: 1)
- Author: Jerry Stauffer <milw265@yahoo.com>
- Date: Mon, 20 Dec 2010 11:27:55 -0800 (PST)
- Hi Tom, and group. The Piggy back ramps were outside north of the building and served both the pigs and also as the lead tracks to the 2 indor tracks tat held about 6 cars each of paper to unload.
- /archives/BRHSLIST/2010-12/msg00265.html (14,445 bytes)
This search system is powered by
Namazu