- 1. Re: [CBQ] Maxon Interlocking (score: 1)
- Author: STEVEN HOLDING <sholding@sbcglobal.net>
- Date: Wed, 19 Feb 2014 21:06:36 -0800 (PST)
- Doug The Wabash plant at Albia was "CTCed" in 1927 to the Q depot at Albia. On 12/4/1932 the tower at Maxon(there was also one at Halpin which controlled the jct. of the North (steep grade) and Sout
- /archives/BRHSLIST/2014-02/msg00265.html (11,121 bytes)
- 2. RE: [CBQ] Maxon Interlocking (score: 1)
- Author: GLEN <glenehaug@msn.com>
- Date: Thu, 20 Feb 2014 00:23:10 -0800
- Doug: To add to Steve's message, the date given in 'Railway Signaling' periodical is 1933 for the CTC between Maxon and Halpin. I have a copy of an article published in the January 1934 issue of 'Rai
- /archives/BRHSLIST/2014-02/msg00268.html (12,193 bytes)
This search system is powered by
Namazu