Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[CBQ\]\s+Interpreting\s+a\s+track\s+chart\s+bridge\s+callout\?\s*$/: 6 ]

Total 6 documents matching your query.

1. [CBQ] Interpreting a track chart bridge callout? (score: 1)
Author: Randy Gordon-Gilmore <randy@prototrains.com>
Date: Sat, 26 Jan 2013 20:58:59 -0600
Hi all, On the track alignment chart, the Salt Creek Bridge at Ashland is called out 1-17' 1-11' 3-20' 13-14' Sp.P.T. 1-132'Th.Tr. I'll appreciate any help on this. Thank you, Randy -- Randy Gordon-G
/archives/BRHSLIST/2013-01/msg00439.html (11,216 bytes)

2. Re: [CBQ] Interpreting a track chart bridge callout? (score: 1)
Author: STEVEN HOLDING <sholding@sbcglobal.net>
Date: Sun, 27 Jan 2013 13:05:24 -0800 (PST)
Hi all, On the track alignment chart, the Salt Creek Bridge at Ashland is called out 1-17' 1-11' 3-20' 13-14' Sp.P.T. 1-132'Th.Tr. I can see that the 1-132'Th.Tr. is the main through truss bridge, b
/archives/BRHSLIST/2013-01/msg00442.html (13,462 bytes)

3. Re: [CBQ] Interpreting a track chart bridge callout? (score: 1)
Author: "John D. Mitchell, Jr." <cbqrr47@yahoo.com>
Date: Sun, 27 Jan 2013 15:09:54 -0800 (PST)
I beleive Sp. = steel piling Those are the spans of the trestle. There was one thru truss 132' long -- On Sun, 1/27/13, STEVEN HOLDING <sholding@sbcglobal.net> wrote: From: STEVEN HOLDING <sholding@s
/archives/BRHSLIST/2013-01/msg00444.html (14,463 bytes)

4. Re: [CBQ] Interpreting a track chart bridge callout? (score: 1)
Author: William Jackson <macon249@yahoo.com>
Date: Sun, 27 Jan 2013 18:51:41 -0500
I beleive Sp. = steel piling Those are the spans of the trestle. There was one thru truss 132' long -- On Sun, 1/27/13, STEVEN HOLDING <sholding@sbcglobal.net> wrote: From: STEVEN HOLDING <sholding@
/archives/BRHSLIST/2013-01/msg00445.html (15,897 bytes)

5. RE: [CBQ] Interpreting a track chart bridge callout? (score: 1)
Author: GLEN HAUG <glenehaug@msn.com>
Date: Sun, 27 Jan 2013 18:11:30 -0800
Randy: It appears you are referring to Bridge 0.91 over Salt Creek on the Prague (Schuyler) branch. The length shown on my records is 406 feet. According to the alignment chart, it consists of a 132'
/archives/BRHSLIST/2013-01/msg00446.html (14,906 bytes)

6. Re: [CBQ] Interpreting a track chart bridge callout? (score: 1)
Author: William Jackson <macon249@yahoo.com>
Date: Mon, 28 Jan 2013 14:27:50 -0500
Randy: It appears you are referring to Bridge 0.91 over Salt Creek on the Prague (Schuyler) branch. The length shown on my records is 406 feet. According to the alignment chart, it consists of a 132
/archives/BRHSLIST/2013-01/msg00457.html (16,032 bytes)


This search system is powered by Namazu