BRHSLIST
[Top] [All Lists]

RE: [CBQ] Burlington Bridge Updates

To: CBQ@yahoogroups.com
Subject: RE: [CBQ] Burlington Bridge Updates
From: Bill Ewinger <bkewinger@yahoo.com>
Date: Tue, 9 Mar 2010 18:16:59 -0800 (PST)
Delivered-to: archives@nauer.org
Delivered-to: mailing list CBQ@yahoogroups.com
Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=lima; t=1268187426; bh=1HsxEw/56xJtYIDyMiHMFwsMMiDpB3uZczLZyJwPzJI=; h=Received:Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:Message-ID:X-YMail-OSG:X-Received:X-Mailer:To:In-Reply-To:X-Originating-IP:X-eGroups-Msg-Info:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type:Content-Transfer-Encoding; b=WOlqAbp+moqFuhT9drIenkcyw5U7bPDPiug0Py/HV2VaSwrwF5O1zxLvQuuqpSaEnJReem80SmGqAWwsu2j6Vg41JWvOxmN9FpHwjroyEyuyy3C0Q3euwrtiYya0Quqb
Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=lima; d=yahoogroups.com; b=OBu3xdejXToIPOBrHeswcpyKuDNVOFJDUvzqreMDMXLQdOfJR7Uv0CVhbyAJpcfA1lMs1jpmhPJ/S2odNVkp8JRWwSemNJlqidhvMoNKGySq232RvfasB7rMPCRCH5RZ;
In-reply-to: <005f01cabfb3$cf7eb800$6e7c2800$@com>
List-id: <CBQ.yahoogroups.com>
List-unsubscribe: <mailto:CBQ-unsubscribe@yahoogroups.com>
Mailing-list: list CBQ@yahoogroups.com; contact CBQ-owner@yahoogroups.com
Reply-to: CBQ@yahoogroups.com
Sender: CBQ@yahoogroups.com
the original plans called for beefen up the east and west prier that are 
currently there and build a new lift span at the shore and float it into 
place.in trying to drill down thruogh the river bottom muck they found to much 
wood-sheet metal-steel-rock for the drill to go through.they were using about 
96" or 108" casino drill down through a steel tube.now that they have change 
and are building to complete new priers i don't know what there idea is about 
the lift span.yesterday dave lotz post in the files section a drawing of the 
current draw span with the new west prier shown in blue and the the new east 
prier will be in the middle on the first fixed span east of the current draw 
span.they weretrying to drill down about 75' below the river bed to reach 
bedrock
 
bill ewinger
burlington iowa

--- On Tue, 3/9/10, Nolen Null <NNull@aol.com> wrote:


From: Nolen Null <NNull@aol.com>
Subject: RE: [CBQ] Burlington Bridge Updates
To: CBQ@yahoogroups.com
Date: Tuesday, March 9, 2010, 6:10 PM


  



Bill

Are they building a totally new Lift Span or do they intend to use the old Draw 
Span as the Lift Span as they did when they rebuilt the bridge over the 
Illinois river at Beardstown?

Nolen Null

From: CBQ@yahoogroups. com [mailto:CBQ@yahoogroups. com] On Behalf Of Bill 
Ewinger
Sent: Monday, March 08, 2010 1:58 PM
To: CBQ@yahoogroups. com
Subject: RE: [CBQ] Burlington Bridge Updates

yes and then build a new west span to connect on that side also
bill ewinger

--- On Mon, 3/8/10, Dave Lotz <Dave_Lotz@bellsouth .net <mailto:Dave_ 
Lotz%40bellsouth .net> > wrote:

From: Dave Lotz <Dave_Lotz@bellsouth .net <mailto:Dave_ Lotz%40bellsouth .net> >
Subject: RE: [CBQ] Burlington Bridge Updates
To: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. com> 
Date: Monday, March 8, 2010, 6:55 PM

So now they are going to replace two sections of the bridge? The drawspan and 
the first fixed span east of the draw? 

-----Original Message-----
From: CBQ@yahoogroups. com [mailto:CBQ@ yahoogroups. com]On Behalf Of Bill 
Ewinger
Sent: Monday, March 08, 2010 1:36 PM
To: CBQ@yahoogroups. com
Subject: RE: [CBQ] Burlington Bridge Updates

ok you are half right here with your drawing.that is the location of the new 
west prier.out under the first fixed span east of the current draw span is were 
the new east prier is going
bill ewinger

--- On Mon, 3/8/10, Dave Lotz < Dave_Lotz@bellsouth .net <mailto:Dave_ 
Lotz%40bellsouth .net> > wrote:

From: Dave Lotz < Dave_Lotz@bellsouth .net <mailto:Dave_ Lotz%40bellsouth .net> 
>
Subject: RE: [CBQ] Burlington Bridge Updates
To: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. com> 
Date: Monday, March 8, 2010, 5:38 PM

OK – I give up!!! I have loaded a new file to the File Area called Burlington 
Bridge New Pier.gif – I’ve marked what I think is the location of the new pier 
in blue.

Dave

-----Original Message-----
From: CBQ@yahoogroups. com [mailto:CBQ@ yahoogroups. com]On Behalf Of Dave Lotz
Sent: Monday, March 08, 2010 12:22 PM
To: CBQ@yahoogroups. com
Subject: RE: [CBQ] Burlington Bridge Updates

Sigh….third time is a charm.
W
B GGG GGG DRAWSPAN
A|====||==== ||======| |======|| ========= ||======= ==||
N------PP--- -PP-X---- PP------- PP------- ----PP--- --------- PP
K|-71’-||-71’--||------- 302’------||---- -210’----||-- ---210’----||
Dave

-----Original Message-----
From: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. com> <mailto:CBQ% 
40yahoogroups. com> [mailto: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. 
com> <mailto:CBQ% 40yahoogroups. com> ]On Behalf Of Dave Lotz
Sent: Monday, March 08, 2010 12:04 PM
To: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. com> <mailto:CBQ% 
40yahoogroups. com> 
Subject: [CBQ] Burlington Bridge Updates

Hi Bill,

OK – I’m officially confused…help me get my bearings…

Below I’ve mapped out a diagram as if you were looking at the bridge from the 
south side. (I hope Yahoo doesn’t scramble it) 
The G’s indicate where the plate girder spans are, the PP’s mark where the 
existing piers are.

I’ve put an X where I envision where they are adding the new pier from your 
description. Are they planning on shortening the length of the new lift span 
from 302’ to 227’?

W
B GGGG GGGG DRAWSPAN
A|====||==== ||======| |======|| ========= ||======= ==||
N PP PP X PP PP PP PP
K|-71’-|-71’||------302’----||--210’---||--210’---|| 

Dave

-----Original Message-----
From: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. com> <mailto:CBQ% 
40yahoogroups. com> <mailto:CBQ% 40yahoogroups. com> [mailto: CBQ@yahoogroups. 
com <mailto:CBQ% 40yahoogroups. com> <mailto:CBQ% 40yahoogroups. com> 
<mailto:CBQ% 40yahoogroups. com> ]On Behalf Of Bill Ewinger
Sent: Monday, March 08, 2010 8:42 AM
To: CBQ@yahoogroups. com <mailto:CBQ% 40yahoogroups. com> <mailto:CBQ% 
40yahoogroups. com> <mailto:CBQ% 40yahoogroups. com> 
Subject: Re: [CBQ] RE: 63 flood Burlington

they have moved appox. 75 yds east and are building a complete new prier and 
this will put the west pier in the middle of channel on the west side of the 
draw span.They had to do this as they could not bore down to bedrock next to 
the east prier because of the debris laying on the bottom of the river.no 
construction has started yet on the new loift span
bill ewinger
burlington iowa

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]

[Non-text portions of this message have been removed]









      

[Non-text portions of this message have been removed]



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/CBQ/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/CBQ/join
    (Yahoo! ID required)

<*> To change settings via email:
    CBQ-digest@yahoogroups.com 
    CBQ-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
    CBQ-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/


<Prev in Thread] Current Thread [Next in Thread>