Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[CBQ\]\s+Ties\s*$/: 2 ]

Total 2 documents matching your query.

1. [CBQ] Ties (score: 1)
Author: "Cyril T. Svobodny" <ctsvobodny@yahoo.com>
Date: Wed, 09 May 2007 23:27:54 -0600
"Railroad ties do last a very long time, even in poorly drained locations." During the very early 70's I helped on the MTM(Minn. Transp, Mus.) Lake Harriet restoration of the streetcar line in Minnea
/archives/BRHSLIST/2007-05/msg00032.html (9,759 bytes)

2. Re: [CBQ] Ties (score: 1)
Author: STEVEN HOLDING <sholding@sbcglobal.net>
Date: Sat, 12 May 2007 19:05:31 -0700 (PDT)
That is the way we use to build track at IRM as well as tear it up all over the Chicago Land to get the materals to build more as more and more equiptment showed up. We use to get called out of any w
/archives/BRHSLIST/2007-05/msg00039.html (10,589 bytes)


This search system is powered by Namazu