Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[CBQ\]\s+Signal\s+Bridges\s+at\s+Burlington\s*$/: 8 ]

Total 8 documents matching your query.

1. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "zephyr98072" <glenehaug@msn.com>
Date: Sun, 3 Dec 2023 01:30:25 +0000
Nelson, and Others: Attached is a PDF schematic of the cantilever signal at MP 204.99, plus a 3 track bridge of the same design as the 2 track bridge at MP 206.8. Although schematic in nature, they s
/archives/BRHSLIST/2023-12/msg00018.html (29,462 bytes)

2. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "Nelson Moyer" <npmoyer@hotmail.com>
Date: Sun, 3 Dec 2023 02:54:34 +0000
Since I model 1953, it looks like I won&#8217;t have to build bridges. Nelson Moyer From: CBQ@groups.io <CBQ@groups.io> On Behalf Of zephyr98072 Sent: Saturday, December 2, 2023 7:30 PM To: CBQ@group
/archives/BRHSLIST/2023-12/msg00021.html (31,307 bytes)

3. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "Dave Lotz" <Dave_Lotz@bellsouth.net>
Date: Sun, 3 Dec 2023 09:03:11 -0500
_._,_._,_ Groups.io Links: You receive all messages sent to this group. View/Reply Online (#66040) | Reply To Group Mute This Topic Your Subscription | Contact Group Owner | Unsubscribe [archives@nau
/archives/BRHSLIST/2023-12/msg00022.html (31,783 bytes)

4. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "Dave Lotz" <Dave_Lotz@bellsouth.net>
Date: Sun, 3 Dec 2023 09:22:54 -0500
_._,_._,_ Groups.io Links: You receive all messages sent to this group. View/Reply Online (#66042) | Reply To Group Mute This Topic Your Subscription | Contact Group Owner | Unsubscribe [archives@nau
/archives/BRHSLIST/2023-12/msg00024.html (32,067 bytes)

5. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "zephyr98072" <glenehaug@msn.com>
Date: Sun, 3 Dec 2023 20:21:45 +0000
Nelson: If you are strictly being prototypical, you will need to include the cantilever at MP 204.99. This was installed in 1950 under AFE 45832. That AFE was for the CTC between Connett and Carthage
/archives/BRHSLIST/2023-12/msg00025.html (32,660 bytes)

6. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "Nelson Moyer" <npmoyer@hotmail.com>
Date: Mon, 4 Dec 2023 00:27:50 +0000
Yes, I will need to dot the cantilever but not the bridge or the targets on the West end as I don&#8217;t model the main that far for lack of floor space. Nelson Moyer From: CBQ@groups.io <CBQ@groups
/archives/BRHSLIST/2023-12/msg00026.html (34,574 bytes)

7. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "Walter" <wohrnell@kc.rr.com>
Date: Mon, 04 Dec 2023 06:39:59 -0800
Dave, I believe that was a spot light on the end of the canopy. The train order boards are further South. Lenny _._,_._,_ Groups.io Links: You receive all messages sent to this group. View/Reply Onli
/archives/BRHSLIST/2023-12/msg00028.html (13,773 bytes)

8. Re: [CBQ] Signal Bridges at Burlington (score: 1)
Author: "Walter" <wohrnell@kc.rr.com>
Date: Mon, 04 Dec 2023 06:56:44 -0800
Dave, BB23 Pages 99 and 116 show the light. Lenny _._,_._,_ Groups.io Links: You receive all messages sent to this group. View/Reply Online (#66047) | Reply To Group Mute This Topic Your Subscription
/archives/BRHSLIST/2023-12/msg00029.html (13,894 bytes)


This search system is powered by Namazu