- 1. [CBQ] Re: GI-67 and 68 interchange between CB&Q and UP (was: PRR-UP power (score: 1)
- Author: james sandrin <jamessandrin@yahoo.com>
- Date: Tue, 7 Aug 2012 11:47:26 -0700 (PDT)
- I had the oppurtunity to watch the actual interchange one summer evening in 1977. The Tower was still standing and a UP GP35 was parked on the connecting track, waiting to serve as the pilot engine t
- /archives/BRHSLIST/2012-08/msg00109.html (11,085 bytes)
This search system is powered by
Namazu