- 1. [CBQ] K-line passenger ops (score: 1)
- Author: Duncan Cameron <d.cameron@sympatico.ca>
- Date: Tue, 8 Nov 2011 13:12:56 -0500
- Would anyone who might possess some late 1800s timetables be willing to check when passenger trains between Burlington and St. Louis began to be operated as Q through trains rather than as separate Q
- /archives/BRHSLIST/2011-11/msg00068.html (10,049 bytes)
- 2. [CBQ] K-line passenger ops (score: 1)
- Author: Duncan Cameron <d.cameron@sympatico.ca>
- Date: Thu, 10 Nov 2011 08:18:53 -0500
- BTW, I answered my own question about when StLK&NW and CB&Q passeneger ops were unified. The 1881 Official Railway Guide has a timetable for July that refers to everything between Burlington and St.
- /archives/BRHSLIST/2011-11/msg00110.html (9,893 bytes)
This search system is powered by
Namazu