- 1. Re: [BRHSlist] construction on the C&I (score: 1)
- Author: GORDON SMITH <kc2bw@a...>
- Date: Sun, 24 Mar 2002 14:42:44 -0500
- Is there evidence of new grading for a new road bed? Maybe the new bridge is to be rolled into place on the present track when all road work is completed, which has been done quite a bit. Or maybe it
- /archives/BRHSLIST/2002-03/msg00193.html (8,032 bytes)
- 2. Re: [BRHSlist] construction on the C&I (score: 1)
- Author: David Hanks <davidjhanks@y...>
- Date: Sun, 24 Mar 2002 17:42:23 -0800 (PST)
- The new track is all on a graded roadbed. The new bridge is concrete & steel so I don't think it is temporary. It looks like they are setting footings for a second bridge (to be built where the prese
- /archives/BRHSLIST/2002-03/msg00197.html (8,493 bytes)
This search system is powered by
Namazu