Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[BRHSlist\]\s+Scheduled\s+work\s*$/: 2 ]

Total 2 documents matching your query.

1. Re: [BRHSlist] Scheduled work (score: 1)
Author: hogger41@a...
Date: Thu, 9 Nov 2000 22:52:36 EST
Leo, The longest stretch I can remember being on was 45 days in a row with at least 3 or 4 double (work 2- 8hr shifts in one day) starts while I was on the Engineers Extra list in the 80's. Gary O.
/archives/BRHSLIST/2000-11/msg00076.html (6,174 bytes)

2. Re: [BRHSlist] Scheduled work (score: 1)
Author: "Karl L Rethwisch" <karlre@r...>
Date: Fri, 10 Nov 2000 08:00:26 -0700
Congo Bongo. As a Fireman on the Congress Park Tabulated Wayfreight I ran up a continuous string of 144 consecutive days when the "days" were 15 hrs. and 59 min. long and Ol' Dad (Jerry Foster) was t
/archives/BRHSLIST/2000-11/msg00078.html (7,263 bytes)


This search system is powered by Namazu