The CB&Q used phase one models of the GE 44 ton switcher these had the smooth front and vents on the side. As a modeler we have the problem that no one does this version, they do the version with the grill on the front. On the Large Scale Central Matt Hutson is modifying a 1:29 model to a D&RG version with dual gauge couplers. This is also a phase one.
I will be watching this for HO ideas.
Ken Martin
_._,_._,_
Groups.io Links:
You receive all messages sent to this group.
View/Reply Online (#57087) |
Reply To Group
|
Mute This Topic
| New Topic
Your Subscription |
Contact Group Owner |
Unsubscribe
[archives@nauer.org]
_._,_._,_
|